Dell PowerVault 56F (16P Fibre Channel Switch) Manual de usuario Pagina 114

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 172
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 113
6-6 Installation and Troubleshooting Guide
-!, !#'
)8
1. Insert the system board module into the switchs cavity and tighten the captured
screw until the module is fully inserted.
2. Reconnect the power supply connector(s).
3. Reinstall the GBICs.
See Installing a GBIC Module found earlier in this chapter for instructions.
4. Reconnect all external cabling.
5. Turn on the switchs power.
The switch automatically runs POST.
6. Check for error messages by issuing the Te l n e t command.
$
Replacing the chassis involves removing the switchs GBICs, system board, power
supply(s), fan assembly, and then reinstalling them into the new chassis assembly.
9
#1 Phillips-head screwdriver
#6 flat-head screwdriver
Vista de pagina 113
1 2 ... 109 110 111 112 113 114 115 116 117 118 119 ... 171 172

Comentarios a estos manuales

Sin comentarios