Dell DAE2P Guia de preparacion Pagina 12

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 27
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 11
10
Step 7 Continued
Verify Power Settings and Connections
In systems with dc power, connect DB9-RJ12 sense cables (sometimes called
SPS emulator cables) between each power supply and the SPS serial connector
on its corresponding storage processor, as shown below.
dc power cords from power/cooling module A (PS A) and PS B connect
directly to independent sources of dc power.
6. Connect the cabinet ac/dc power cords to the power outlets in your facility.
We recommend connecting each power cable to a different branch circuit. You
must connect both power cords to appropriate power sources. Connecting to only one
power source will degrade the system’s high availability.
Systems with dc power are intended for use in environments with redundant and highly available
power sources (for example, "Central Office" grade power within the telecommunications industry),
and dc power provided by the site must meet this requirement. The sudden loss of all incoming dc
power to a storage system may cause unexpected abnormal behavior of the storage system and loss
of write-cache data.
+
-
EMC2960
SP ASP B
Vista de pagina 11
1 2 ... 7 8 9 10 11 12 13 14 15 16 17 ... 26 27

Comentarios a estos manuales

Sin comentarios