Dell Lifecycle Controller 2 Version 1.3.0 Manual de usuario Pagina 18

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 157
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 17
Lifecycle Controller IntegrationBest Practices Specification
18
1.7.3 11G and 12G compatibility
Figure 3. Compatibility with 11G Workflows
NOTE: Dotted lines denote the old behavior. Bold red line denotes the new behavior in 12G.
The existing 11G workflows expect the RS status to be in RELOADING state once the job is marked
COMPLETED. So to maintain the compatibility with the 11G workflows, the RS status is artificially held
in the RELOADING state for 90 seconds even though it is actually READY. This time limit was provided
by the console team.
[NOT TOSCALE]
READYFOREXECUTION
SCHEDULED
JobStatus
RUNNING
COMPLETED
GetRSStatus()
RELOADING
READY READY
SYNC
TIME
GetRemoteServicesAPIStatus()
LifecycleController LifecycleControl ler
RemoteServicesisnot
ready. RemoteServicesis ready.
Vista de pagina 17
1 2 ... 13 14 15 16 17 18 19 20 21 22 23 ... 156 157

Comentarios a estos manuales

Sin comentarios