Dell Networking S6000 Guía de inicio rápido Pagina 23

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 37
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 22
Installation 19
Two-Post Center-Mount Configuration:
1
Slide the plunger bracket rearward until it clicks into place and secure the
bracket to the front post flange with two user-supplied screws. Refer
to Figure 4-3, item 1.
Figure 4-3. Two-Post Center-Mount Configuration
2
Slide the back bracket towards the post and secure it to the post flange with
two user-supplied screws. Refer to Figure 4-3, item 2.
3
Repeat this procedure for the second rail.
Four-Post Threaded Configuration:
1
For this configuration, remove the flange ear castings from each end of the
ReadyRails assemblies. Use a Torx driver to remove the two screws from
each flange ear and remove each casting. Refer to Figure 4-4, item 1. Retain
the castings for future rack requirements.
2
For each rail, attach the front and rear flanges to the post flanges with two
user-supplied screws at each end. Refer to Figure 4-4, item 2.
Vista de pagina 22
1 2 ... 18 19 20 21 22 23 24 25 26 27 28 ... 36 37

Comentarios a estos manuales

Sin comentarios