
Field Description
• Power On—Powers on the system. This option
works only on target systems that contain RAC.
Shutdown OS first Select to shut down the operating system before
executing the server power options task.
Task Target
Select a query Select a query from the drop-down list. To create a new
query, click New.
Select the device(s) for this task to target Select the devices to which you want to assign this task.
Enable All Select to override the device capability and allow all the
available devices for selection as task targets.
Schedule and Credentials
Set schedule Select from these options:
• Activate Schedule—Select this option to activate
a schedule for the task.
• Run now—Select this option to run the task
immediately.
• Set schedule—Select this option to set a date
and time for the task to run.
• Run Once—Select this option tot run the task on
the planned schedule only once.
• Periodic—Select this option to run the task
frequently at specified intervals:
– Hourly—Select this option to run the task
once every hour.
– Daily—To run the task once every day.
– Weekly—To run the task once every
week.
– Monthly—To run the task once every
month.
Range of Recurrence:
• Start—To specify the date and time at which the
task should begin.
• No End Date—To continuously run this task
based on the selected frequency. For example, if
you selected Hourly, then this task continuously
runs every hour from the start time.
• End By—To stop the task at the specified date
and time.
Enter User Name and Password User Name—Provide in the format domain\user name or
local host\user name.
Password—Provide the password.
Power On works only on target systems with iDRAC; use
the IPMI credentials to perform Power On task.
If you selected Power On, then provide the KG key.
KG Key—Enter the KG Key. DRAC also supports IPMI KG
Key. Each BMC is configured to require an access key in
164
Comentarios a estos manuales