Scheduling Discovery
NOTE: It is recommended not to schedule the discovery task at the same time as the Database Maintenance
Execution Schedule, as the console is less responsive during database maintenance.
1. Click ManageDiscovery and InventoryCommon Tasks Discovery Schedule.
2. In Discovery Schedule Settings:
a) Select the desired schedule parameters.
b) (Optional) You may adjust the task speed slider for faster task execution; however, more system resources are
consumed if the speed is increased.
c) Discover all instrumented devices.
Related Links
Discovery and Inventory Portal
Last Discovery and Inventory
Discovered Versus Inventoried Devices
Task Status
Discovery Speed Slider Bar
This control, also known as the discovery throttle, controls how fast discovery occurs and how much network and
system resources are consumed for discovery by controlling the:
Number of discovery threads that are allowed to run at any point of time.
Delay in between the communicating devices during a network ping sweep, in milliseconds.
NOTE: Each tick on the throttle control equals 10% and the range is from 10% to 100%. By default, in OpenManage
Essentials, the discovery throttle is set at 60%. After an upgrade from IT Assistant, the throttle control remains at its
previously set value.
Multithreading
Dell OpenManage Essentials improves upon the optimized parallel threading implementation in the Network Monitoring
Service introduced in IT Assistant.
As the discovery process is I/O intensive, you can optimize the process by making it a parallel operation, where threads
running in parallel (known as multi-threading) send requests and handle responses to several devices simultaneously.
The more threads that run in parallel, each communicating to a different device, the faster is the discovery; barring
overall high network congestion or latency. The discovery process, by default, allows a maximum of 32 threads to run in
parallel (or concurrently) at any one time for discovery.
To control the number of parallel threads executing, move the discovery throttle control either left or right. When set at
the maximum, 32 parallel threads are allowed to run. If the throttle is at 50%, only 16 threads are allowed to run at any
one time.
As the discovery service is optimized for parallel threading operations, the system can utilize more system resources
even at the same throttle setting. It is recommended that you monitor the system resources so that a satisfactory trade-
off is made between discovery speed versus system resources available for OpenManage Essentials. Lowering or
increasing the throttle depends on the system it is running on and the available resources. Note that the discovery
service may take up to several minutes to adjust to a new throttle setting.