
– Selecting a Layer 2 VLT and Layer 3 with Resiliency (Routed VLT) Fabric Design
3. Build the physical network.
4. Configure the following settings:
– TFTP/FTP
– SNMP
– CLI Credentials
5. Prepare the Fabric for Deployment
6. Deploy and Validate the Fabric
7. Validate the deployed fabric against the fabric design.
8. Monitor the fabric health and performance. See Performance Management.
NOTE: To provision the fabric, enter the Dell Networking operating system (FTOS) CLI user’s Credentials and
enable the configuration credential for all the switches in the fabric. For information about this topic, see CLI
Credentials.
CAUTION: If you are using a switch that has already been deployed, reset its factory settings in the fabric. The
switch must be in Bare Metal Provision (BMP) mode.
Designing and Deploying a Fabric Flowchart
The following flowchart shows how to design and deploy a new fabric.
Figure 2. Capacity Planning
15
Comentarios a estos manuales