Pre-deployment – Step 1b: Uplink Configuration
Pre-deployment - Step 1c: VLT VLAN Configuration
Pre-deployment – Step 1d: Port Channel Configuration
Pre-deployment – Step 1e: Downlink Port Configuration
2. Pre-deployment – Step 2: Assign Switch Identities
3. Pre-deployment – Step 3 Management IP
4. Pre-deployment – Step 4: SNMP and CLI Credentials
5. Pre-deployment – Step 5: Software Images
6. Pre-deployment – Step 6 DHCP Integration
7. Pre-deployment – Step 7: Summary
Pre-Deployment Configuration
To prepare the fabric for deployment, use the Pre-deployment Configuration Wizard. After you initiate the pre-
deployment configuration, you can only update the fabric description and port count for expanding uplinks and
downlinks.
Prerequisites
Before you begin:
1. Rack the equipment in the fabric.
NOTE: Before racking the switches, make sure that you have the .csv file that contains the system MAC
addresses for each switch in the fabric. If you do not have this file, record the system addresses before you
rack the switches.
2. Power off the switches in the fabric.
Gather the useful information listed in Gathering Useful Information for a Layer 3 Distributed Core Fabric or Gathering
Useful Information for a Layer 2 VLT Fabric, or Gathering Useful Information for a Layer 3 with Resiliency (Routed VLT)
Fabric.
Use the following pre-deployment flowchart as a guide to prepare the fabric for deployment.