Dell OPENVIEW NNM SE 1.2 Guía para resolver problemas Pagina 39

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 156
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 38
support.dell.com Installing the Dell PowerVault 51F Switch 1-11
Installing the Cable-Management Arm
1. From the back of the rack, pull the switch out about 7 centimeters (cm) (about
3 inches).
The switch should lock in place.
2. Attach the end of the cable-management arm to the inner rail by inserting the
two T-tabs into the two T- slots until the retaining clip snaps into place (see
Figure 1-8).
Figure 1-8. Installing the Cable-Management Arm
Velc ro stri ps
cable-management arm
T- t a b s
T-slots
retaining clip
thumbscrew
inner rail
safety release latch
Vista de pagina 38
1 2 ... 34 35 36 37 38 39 40 41 42 43 44 ... 155 156

Comentarios a estos manuales

Sin comentarios