
Safety
Power-up Sequence (Installation and Service Only)
Rev. D Dimension 3100 Manual 29
______ 4. Install the control station by completing the following:
_______ Set the table to be used as the control station next to the Dimension 3100 SPM.
_______ Place the input and display devices on the user console (monitors [2], mouse,
keyboard and trackball).
_______ Place the computer and controllers on the control station.
Connections
______ 1. Connect the control station extensions.
_______ Computer AC power cable to power strip
_______ Monitor power cables (2) to power strip
_______ Monitor video cable to computer
_______ Keyboard to computer
_______ Mouse to computer
_______ Trackball to computer
______ 2. Connect the Dimension 3100 SPM unit extensions.
_______ Serial cable (12’) from computer to Dimension 3100 SPM back panel
_______ BNC cable from computer to Dimension 3100 SPM back panel
_______ RJ45 LAN cable from computer to host
_______ Serial cable (6’) from computer to Dimension 3100 controller
_______ 37-pin D cable from NanoScope controller to Dimension 3100 back panel. (the Basic
Extender and Quadrex connect between Nanoscope controller and D3100.)
_______ Vacuum hose assembly from Dimension 3100 controller to Dimension 3100 SPM
back panel
CAUTION: Make sure to power-down all systems at this point to ensure that
there is no risk of electrical shock.
ATTENTION: Vérifiez que tous les systèmes ne soient plus sous tension à ce
moment, et assurez vous qu’il n’y a pas de risque de choc
électrique.
VORSICHT: Überzeugen Sie sich, daß zu diesem Zeitpunkt alle Geräte
ausgeschaltet sind, um die Gefahr eines elektrischen Schocks
auszuschließen.
Comentarios a estos manuales