367 | Using VisualRF Dell Networking W-AirWave 8.0 | User Guide
</access-points>
</floor>
<floor name="2nd Floor" number="44" building-name="Library" campus-name="University">
<image filename="blueprint2.dwg"/>
<access-points>
<access-point name="ART.2.12" x="196.31" y="92.19"/>
<access-point name="ART.2.11" x="204.82" y="55.78"/>
<access-point name="ART.2.10" x="133.08" y="55.81"/>
<access-point name="ART.2.9" x="73.79" y="55.78"/>
<access-point name="ART.2.8" x="73.72" y="104.26"/>
<access-point name="ART.2.7" x="73.91" y="134.88"/>
<access-point name="ART.2.6" x="73.83" y="162.72"/>
<access-point name="ART.2.5" x="73.82" y="183.61"/>
<access-point name="ART.2.4" x="63.74" y="125.48"/>
</access-points>
</floor>
</visualrf:site_batch>
Common Importation Problems
l Improper or undefined UNITS or MEASURE
l Text embedded into the Model view which causes an inconsistent bounding box
l Large dimensions which cause grainy resolution upon zoom
l Legacy CAD versions prior to Release 15 or AutoCAD 2000.
Importing from a Dell Networking W-Series Controller
The instructions below will enable you to seamlessly migrate all building, campus, and floor plan information previously
entered into a Dell Networking W-Series controller.
Pre-Conversion Checklist
Prior to importing floor plans, ensure that VisualRF's memory allocation is sufficient for the anticipated number of floor
plans.
To change the memory allocation, navigate to the VisualRF > Setup page and configure the memory allocation
accordingly. Memory allocation should equal .5 GB for 1-75 floor plans, 1 GB for 76-250 floor plans, 1.5 GB for 251-
500 floor plans, and 2 GB for 501-1,000 floor plans.
Importing a large number of floor plans can impact performance of the AirWave server. VisualRF must create a thumbnail,
provision APs, create attenuation grid, and locate all clients on each imported floor plan. This can cause the VisualRF >
Floor Plans page to be unresponsive.
Process on Controller
1. On the controller's UI, navigate to the Plan > Building List page.
2. Select the buildings to be exported and select Export.
3. When the dialog box appears, make sure that you have included all images and select Save to a file.
Process on AirWave
1. Navigate to VisualRF > Import.
2. Select the Import floor plans from an Aruba/Dell Networking W Controller link.
3. Select the Begin Importing Floor Plans link.
4. When prompted for input file, use the file saved from the controller process.
Vista de pagina 366
1 2 ... 362 363 364 365 366 367 368 369 370 371 372 ... 376 377

Comentarios a estos manuales

Sin comentarios